Having Dad here for two weeks has slowed progress, but not stopped it.Last weekend I managed to fabricate the cwenteral control box and it is now wired. The vehicle is now basically complete. We will do a full vehicle tied down static test some time in the next week or so. This should allow us to gather some vibration data on how the IMU and GPS react to rocket vibration. After that we should start testing within the month. Its getting perilously close to the hot season out in Mojave so time is getting short.
We also need to restart the FAA paperwork process so we can do some free flights.