Sunday, July 15, 2007

Weekend Testing results...

This weekends motor tesoting started out with a lot of little issues.Not the least of which was sleep deprivation. We finally got them straightened out in the early afternoon and had two successful tests. The second test was operationally perfect. For some reason we did not get chamber pressure, but the light was perfect and the motor ran really well until we ran out of helium pressurizing gas at about 95 seconds of run time. (The previous minor problems used a lot of helium). the two key events were:

1)The motor started correctly. This was the result of using a lox lead and pre-flowing the igniter for a few seconds.

2)We did a number of throttle step tests with the new fast butterfly valves. From the gathered data we were only really throttling the fuel side, but the response time and the fact that the motor ran down to 75 PSI input pressure was really good news.

I was manually operating the valves in an open loop manner and the response from giving the step up/down command to seeing the mach diamonds change was instantaneous to my perception. Lastly we had a teperature probe in the fuel feed and we are ok for heat load. At full throttle my guess is we are getting some boiling, but not extreme boiling. The video camera shutdown about 15 sseconds into both tests. I'm beginning to wonder if the there is some sort of IR oscillation in the motor that is commanding the camera off. The first 15 seconds with the first throttle step at the the end of the video is here I'll put tape over the IR remote port next time. The gathered data is below:


Wednesday, July 11, 2007

This weeks plans.

We are planning to do a test fire again this Saturday. We have made a number of changes. We have added very very fast butterfly valves just after the main (slow) ball valves. We hope this will have a bit more linear throttle action and be somewhat faster. Toward that end we have set up a flow test with an exact engine string, pressure transducer, ball valve, butterfly valve , pressure transducer,turbine flow meter , long tube and pintile orifice. We have started mapping how linear the valve is and it's flow response. This will all be on the test stand before Friday.

In addition I found some very small isolated thermocouples and we will instrument the fuel temperature rise for this event. So this weeks fireeing should generate some good data. I always planned to have the thermocouple, but the non-isolated version had some ground loop problems that totally swamped the signal I was trying to measure.


On the stability and control front I upgraded my helicopter from a Trex 450 to a Trex 600, it no longer wallows with the IMU, GPS and computer attached. We will report more on this effort next week.

Thursday, July 05, 2007

A Quick update...

Due to some scheduling issues we will not be testing this comming weekend, but we will be testing the weekend of the 14th.

Since the airlander flight testing did not go so well I thought I'd sneak up on the problem. I took my IMU, CPU, Telemetry radio and GPS and weighed it. I then took that much lead and put it on my Trex 450 RC helicopter. It's a small helicopter as RC helicopters go and I wanted to see if it could carry that much weight. So with 290 grams of lead it flew just fine, hovered for close to 5 minutes.

Step 2 Actually mount all that stuff to the helicopter and see if all works.
So I mounted the GPS, IMU, Telemetry Radio to the Helicopter. I then took the outputs from the RC receiver to the CPU board and then ran the helicopter servos from the CPU. The CPU is in the loop, but not yet doing anything but passing the commands directly from the RC receiver. I added an additional input from the RC receiver that I call mode that will allow me to switch from manual contol to automated control as time goes on. The GPS, RC receiver and telemetry radio all seem to coexist with no detectable interference.

I also did a fair bit of work on my telemetry display framework. My windows coding is a bit rusty so that has been an interesting challenge. So I flew it in my driveway, everything worked perfectly but my thumbs. I've been flying the copter in my driveway for awhile, but my wife added a new shrub........In any case I need to get new blades at the hobby store as I cliped the edge of the shrub and this pulled the helicopter into the shrub. None of the electronics or expensive bits seems to be damaged, just the typical helicopter crash parts, blades, flybar etc...
I'll get the replacement parts on Friday and go to a large open field and start doing some serious testing this week end.

I recorded the telemetry during this whole flight.
You can take a look at it I've uploaded the telemetry data file and the executable to view it.
The executable is the same one that shows telemetry in real time so on startup you need to select the "replay log" button. Then load flight2.dat. The log file has a bit of dull data as I go from starting the recording to connecting the RC power battery and moving the helicopter into position. Liftoff is around frame 8000. You probably want to click the 10X button until data starts changing. The 5 combo boxes on top left control what data is displayed.
The screen shot on the left is centered at the moment of shrub acquisition.
The derived Roll, Pitch and Yaw seem really reasonable, the rates and accelerations seem really noisy. Enjoy following along.

As always its probably not a good idea to download and run an executable from someone you don't know without virus scanning it etc... This exe was done for me on my computers so if there is a missing DLL, it crashes etc... no guarantee....

Tuesday, June 26, 2007

Out of Town this week.

I went testing last weekend and have some more video. The testing raised more questions than it answered. I'll be back in town Friday and try to post some of the video and more commentary. I'm away at the freescale technology forum in Orlando. The cool non-rocket news is that the new Netburner product I designed, the Product Kit won the best in show award!

One question for the rocket geeks... I'm still having troubles getting the engine reliably lit. Is there any harm to a really long (A second or more) LOX lead?

Thursday, June 21, 2007

FAA paperwork milestone.

I just got off the phone with the FAA/AST and they have determined that my application is complete enough to begin the evaluation. (This used to be called sufficiently complete) This is the official milestone that starts the 120 day clock. Since the Application they deemed complete enough was received by the FAA on May 29th They are now legislatively bound to approve or disapprove the application by September 26th. They can still ask for a lot of information and request changes in the vehicle or safety systems, but at least the clock is started.
Here is the offical PDF (with addresses and phone numbers removed)

Sunday, June 10, 2007

Another long burn

We tested this weekend.
We ran the motor 113 seconds. The video is here...

More info later.

Wednesday, June 06, 2007

More chamber failure testing...

We went out to the test site last Sunday to test the normal soldered
chamber. It failed by buldging in, but no where near as bad as the earlier failures. It bulged in exactly inline with the igniter outlet. So maybe the torch igniter is softening the chamber wall. We are goign to try a number of fixes for this this again this weekend. Three expeditions to Mojave in three weeks is a bit hard on the sleep schedule.

Thursday, May 31, 2007

Chamber failures explained.

Tonight I made a chamber liner by silver soldering it at high temperature.
In my pressure test fixture it failed between 380 and 400 PSI.
So this explains my motor failures, but does not really give me a huge amount of comfort. It means I can never get the liner hot enough to anneal it and I am Dependant on the annealed condition of commercial water pipe for my strength.

We are going to test fire again the weekend.

Wednesday, May 30, 2007

Simulating Chamber failure at home.

Any time I can run an experiment at home that replicates things I see at the test site it's a huge win. Tonight I fabricated a plugged injector plate and soldered up a chamber inner liner and throat. I used the plugged injector plate to Hydro test the chamber to failure. The chamber liner failed at 1750 PSI. It failed in exactly the same way as the chambers that failed in the field did. This liner and throat were soldered with normal relatively low temp solder.

Thursday I will solder up a throat with high temp silver solder and test that to failure.

As part of doing this test I also abused my o-ring seals, no lubricant and hammered them together. I even got o-ring slivers sliced off the injector end o-ring. Still the o-rings held and did not leak at 1750 PSI.The Snap ring retainers and the fuel feed plumbing also held the pressure. All in all a good test.

For one last reality check Plain old un alloyed copper has a work hardened to fully annealed yield strength ratio of ~5. So 1750/5 = 350PSI we were running the fuel feed at around 375.
At some level it all makes sense.

Monday, May 28, 2007

Chamber Failures


This weekend we had two chambers fail identically. We set out to verify we had solved our ignition problems. So for our first test we ran a few seconds , purged a few seconds and ran again. Both ignitions were perfect. On the second start we saw a big green copper flash. We thought this chamber failure was due to too short of purge. But in reviewing the video I see we got a green flash on shutdown. We ran a second motor and it failed on startup.

Thoughts on the failures:
The first chambers we built we used high temp silicon to seal to the carbon throat and had the spiral wires soldered on with normal solder. The chamber to aluminum jacket tolerance was so tight we had to assemble the motors with a sledge hammer.

The motor we ran for 106 seconds had the copper throat soldered into the chamber wall with normal solder and spiral wires soldered on with normal solder. This motor was tight, but only needed light taps, not the full sledge treatment.

When we disassembled that motor we discovered that some of the spiral wires were loose, we did no know if that was an issues with getting hot of breaking the wires loose on assembly / disassembly.

As a result we decided that we should silver solder the parts together. So the last two motors we built with silver solder. This requires that we get the copper liner much hotter and probably removes the temper. As we have been using copper water pipe the temper is a side effect of the forming process and is not guaranteed to be in any particular state of hardness.
My current set of hypothesis is as follows:
  1. We are softening the chamber walls when we silver solder the parts together.
  2. The Hotrod igniter is making a soft spot on the chamber side leading to local buckling.
  3. We got a different batch of water pipe and is is less tempered.
My corrective actions are:
  1. Switch back to normal solder for the throat and spiral wires.
  2. Rerun our flow rate tests we ran on the first chamber to verify we have not drifted off of nominal.
  3. Do a hydrostatic collapse test on the pipe we have to see if the batches are different.
  4. Build up 4 chambers for testing, hopefully, next weekend.
  5. One of these chambers will use thicker pipe wall.

My verification tests are as follows:
  1. Run a test where we run the igniter and then hit the chamber with full fuel pressure, but no lox if this collapses then we have the igniter too hot or oriented wrong.
  2. Rerun the tests we tried this weekend.
  3. If both of these fail retest with the thick wall chamber.

Sunday, May 27, 2007

Murphy Wins!

We went testing this weekend....
The game was not even close, Murphy won.
Video Summary here

1)Saturday Afternoon Very little lox, almost none.
Masten Space was nice enough to sell us some of theirs.
Thank you thank you thank you!


2)Saturday late ran the test chamber twice
Melted the test chamber in a new way. Video and pictures Monday.


3)Late Saturday set up telescope.
One axis is broken and drive motor makes grinding noises.
Used it in manual mode looked at moon and Jupiter, very cool viewing.


4)Sunday Morning test stability and control air lander...
No stability no control we now have pieces...video later


5)Sunday noon time...Tested 2nd chamber failed immediately with the center copper chamber wall buckling and collapsing inward. Same failure as #2 above.


6)Sunday just after noon help SDSU students with telemetry for their rocket.
SDSU has spectacular hard start and fireball. (video Monday)

7)Early Saturday Successfully flew my RC helicopter.
Saturday Afternoon flew it again, tail rotor belt failed.
Failed in low hover, no other damage.


8)Sunday about 3:30 got flat tire.
Spare was flat. The road to the test site is rock and dirt, very hard on tires.
(Had a 12 V compressor with me, dodged Murphy a bit)


Murphy 8 unreasonable rocketeers ZERO.

No one was physically injured, when I got home the house had not been leveled by a stray meteor, its all part of the process.

Friday, May 25, 2007

I've received the first Tee Shirts

I've just received the first Unreasonable Rocket Tee's and they look good.
So feel free to order some at the Store.

Learning Curve/Frustration...

I brazed my last injector myself, but it got really oxidized.
I was worried about the black oxide flakes plugging up the injector.
So I thought I would step up to the plate and have the next one furnace brazed.

So I did about 30 hours of machining making all the parts and took it to a company that specializes in furnace brazing. As I did it all myself I had the peice part drawings, but did not have an assembly drawing. The parts only fit together one way.

So I carefully showed them how it all goes together with the warning that it was very important that the gap between the pintile and the injector face not be brazed....

Unfortunately the person doing the work was not the person I presented the parts to. The person I presented the parts to came from the shop end of the building so I figured he would be doing the work.

I got it back today and the gap between the pintile and injector plate is brazed shut. $200.00 of telerium copper and more importantly 30 hours of work are scrap. Argggh!

Key learning point.... If the shop is used to detailed assembly drawings provide them one. Even if it is self explanatory to you it may not be so to them.

FAA Permit Application

I've just finished printing the two copies of my experimental permit application. I'm on my way out the door to send them.

As I've stated previously I would make anything I formally submit available.
Here is the Application and the Cover Letters.

I'm a tiny bit queasy making all of this public, but one of my main goals is to try to demystify the process of doing rocketry as much as possible. The regulatory aspects are a key part of that process.

Wednesday, May 23, 2007

AST News.

I got a chance to chat with my AST representative today and I'm pleased with the discussion. He indicated that I should probably formally submit my next revision and not just send them a draft for review. While not a formal endorsement, it at least implies that I'm close to "complete enough". I hope to finish up and Mail the Fed-X the formal application on Monday or Tuesday.

In a past life I was responsible for negotiating the technical engineering aspects of a significant subcontract. whenever we found ambiguity in the contract it was good news because we could exploit this to get more money from the prime. As a result I have a fine tuned "ambigious nit sensor". I have to fight this impulse to pick these nits when working with the FAA.

A simple example:
One of the comments I received on my draft application was :

AST understands that there are no hazardous materials asociated with the vehicle.
However for the purposes of documentation completeness, the application still needs to state positively that there are no hazardous materials used in the suborbital rocket.

Seems like a simple statement and they are really looking for a statement that I'm not using hydrazine or some other really nasty substance. This seems really simple,but my "ambigious nit sensor" goes off and I start wondering ....

Is Lead solder Hazardous?
Is the Lead in Brass Hazardous?
Is the gallium arsenide in the GASFET RF amplifiers hazardous?

So I write the following:
Unreasonable rocket will not be using any environmentally hazardous substance, we are only using benign non-toxic propellants . The non- consumable portions of the vehicle will be constructed with aluminum,copper, stainless steel and normal composite structures. The only components of vehicle that might contain nominally hazardous materials are the trace elements in the electronic components and lead containing solders that are part of these assemblies. The commercial components will all be RHOS compliant lead free, but the non commercial components assembled for this effort will use lead solder for reliability purposes.

What I finally put in the application is:
Unreasonable rocket is not using any hazardous consumables.


Tuesday, May 22, 2007

Fabricating our first vehicle....

Our test stand used flight weight tanks and valves.
Our first vehicle is going to look a lot like four of these test stands.

Toward that end my son and I have been fabricating and buying parts, we hydroformed and machined 17 tank ends (1 spare ),

We had Thunderbird Water jet cut some valve parts and brackets.

We ordered and received a batch of tonegawa servos from Tokyo hobbies.

Tube services sold us some aluminum tubing to make tanks.

We ordered all the tank weld on AN fittings from Iindustrial liquidators They are a dealer for Earls Fittings.

Lots of Valves, snap rings and parts from McMaster Carr.

I have enough Tellirium Copper to build 20 or so Motors purchased from Cambrdige Lee.

3 Vehicles of solinoids from Predyne.

1.25 Vehicles of ignition modules from CH-Ignitions.

2 Vehicles worth of Composite helium tanks on Order from SCI.

O-rings from Real Seal.

On Friday I pick up a furnace brazed Injector assembly from Certified Metal Craft.

Flowers for my understanding wife from ProFlowers.com....
(Delivered some time Wednesday Morning. Shes' usually home in the mornings, so I've asked her if she can be home Wednesday Morning to receive a very important package for my project, she just doesn't know its flowers for her...yet....)

I'm sure I've left off and forgotten a million vendors.







Our New Logo....
























What would a new logo be without a Tee shirt Shop...
Buyer Beware I have not yet seen this printed on a Tee shirt.
The colors may not work... I've ordered a few I will update
the blog with a good/bad review later this week when they arrive.

Friday, May 18, 2007

A trip to DC

On Monday I flew to DC to meet with AST to discuss my draft experimental permit application and to attend the Experimental Permit workshop. After this series of meetings I'm feeling pretty good about the paperwork side of the process. AST did not ask for anything that was at all unreasonable. The comments to my draft application were entirely reasonable and I'm very hopeful that my next submission will be judged as "Complete enough" to start the 120 day permit clock. Now back to actually building a vehicle capable of competing.

While I was in DC I went to visit the Aerospace museum. It was really sad that the only launch hardware advances in the museum newer than 35 years old was Spaceship one.
We made incredible advances in the 50's 60's and early 70's, since that time we have done nothing to extend that legacy of development. What we have instead is an entrenched NASA bureaucracy striving to get funding for a development boondoggle of biblical proportions.

Sunday, May 13, 2007

Testing 5/12 (sort of)

After the last test sequence I did some more igniter test work and made a few changes:
  • Increased the orfice sizes raising the igniter chamber pressure from 80 to 160 PSI.
  • Changed the check valves to metal seat check valves and moved them closer to the igniter.
  • Added a sintered fuel filter to keep from plugging the fuel orfice.
  • Changed the orifices from steel to stainless.
After verifying all of these changes with some igniter tests using GOX/Ethanoal I fabricated a new injector and chamber assembly. I also took Sunday the 6th off and went up to help Kevein weld on the Large vertical test stand. It was a really busy week, we finished up and headed to the test site about 19:30 on Friday.

We have been bringing our own LOX out to the test site, but this time we were bringing two barrels of Ethanol and did not want to carry both on the highway at the same time. So we had the LOX delivered. We arrived at the test site about 00:30 Saturday morning. As we unpacked and got ready to camp we noticed a loud hissing noise and discovered it was the lox dewar venting, It was completely empty. The short version is no LOX no testing.

Saturday was scheduled to be a FAR work party weekend, so we spent the day working on the facility. We shovled the sand out of the block house, and laid out and leveled the Emergency Medical Evacuation Helipad. (Just happens to be a 10M diameter circle.)

On Monday the 14th I fly back to DC to talk to the FAA about my experimental permit and to attend the experimental permit workshop.

Testing 4/28

I'ts been 4 weeks since I last offered an update. We have been testing every 2 weeks, two weeks ago we went out to test with the goal of improving our ignition reliability and doing some throttle testing.

After reviewing the data from our earlier test series we learned that the fuel and LOX pressures were not coming up evenly to the commanded start position. The end result is that we tried to start at idle and then powered up to full throttle. We probably did this before the chamber was 100% lit causing harder starts. So we modified the software to change this sequence and went out to try again. The only physical change to the motor was a change from bolted to snap ring closures on the motor.


We tried to start the motor 4 times with only one successful light. After the first two failures to light we changed the software back to its origional condition and tried a third time, still no light.
So some diagnostics showed that the igniter fuel solenoid was dead. We replaced that and tried a fourth time. We did not switch the old software back to the new so for the forth attempt we successfully lit the motor but it started a bit hard. At this point we were suffering for the 3 failed attempts as we were running low on presurant gas. The video camera had also been running for more than an hour and it gave up the ghost so we got no video of the 4th run. The 4th run was a 30 second throttle test.

As we had been messing with the igniter connections diagnosing the no-light issues the igniter plumbing connection at the fuel solinoid was loose so we got chamber gas flow backwards into the igniter at about 20 seconds into the run the fuel solenoid decided it had had enough of hot gases leaking at it and let a burst of fuel into the aluminum line between the chamber and igniter. The mixture was just right to detonate in the line. So we have a small bulge/hole in the fuel line between the igniter and the fuel solenoid. At or near the same time the chamber pressure transducer disassembled it self. We did not notice any of this from the block house the only thing we knew is that the chamber pressure went to zero. The motor continued to run
and did its throttle steps for another 10 seconds or so. This chain of events is pure speculation based solely on the visual state after the run and the data we collected.

When we returned home and disassembled the motor we also determined that the injector plate was bent.